JakMat Geocell - Car Park Application at Lady Elizabeth Residential Home in Takanini
CONTRACTOR: Paul Hood Landscapes.
|
|
|
Ground preparation entailed:
- removal of previous concrete paver surface;
- putting down of small layer of base course aggregate (GAP20) over an existing base and
- levelling compacting
|
|
|
|
The JakMatGeocell was laid with cutting done where necessary, with power and hand tools for a snug fit against concrete haunching. |
|
|
|
A decorative river pebble 5 - 10mm (discrete) was used for the filling and capping the JakMatGeocell. |
|
|
|
Utilities were easily worked around with cutting of mats. |
|